The ball mill upgrade should mean
altering the design of this machine in an approach to improve its building
level and performance criteria. It is just stable to upgrade the ball mill if
the costs are paid in 2 to 3 years, the machine limit develops by no less than
20 to 30%, and the machine will be utilized for no less than 5 years.
The planetary
ball mill manufacturers build the milling machine where its limit is
expanded by developing its energy and by motorization and robotization of
assistant operations. The power is expanded by supplanting the electric
engines, changing the design parameters of the mechanical transmission (pulley,
sprocket, equip wheel), introducing an uncommon diminishment adapt (planetary)
between the electric engine and the working part.
The inflexibility and vibration
resistance is expanded by introducing fortifying ribs on the most stacked
territories of the structure, changing the lodging configuration, giving weld
creases as per the technology and distortion modes, supplanting elastic and
spring safeguards with water powered safeguards.
Drawing out the life and
upgrading the flawlessness of the equipment is guaranteed by expanding the wear
resistance of basic parts, enhancing grease conditions, utilizing defensive
gadgets for direct casings, support of powerless segments (material
substitution, warm treatment, change of measurements and shapes).
To improve the operational
security and encourage servicing, the locking gadgets constraining perilous
zones, stops and point of confinement switches, defensive gadgets and cautions,
and so on might be introduced as required.
Out of date quality is because of
development of the equipment of higher performance which makes the utilization
of the obsolete equipment inexpedient. The out of date equipment is supplanted
with the better and brighter one. An effective intends to take out the outcomes
of the out of date quality is the upgrade, i.e. upgrades of the current
equipment so that to enhance its performance criteria to the criteria of the
comparative equipment of more present day designs with affordable planetary
ball mill price.
One of the conceivable methods
for upgrading the ball mill is automating the milled material charging. It
decreases the extra operation time. It is recommended to introduce a drum-sort
proportioning feeder onto the charging funnel. The feeder will be driven by the
wood screw for bolstering the product into the drum through a chain
transmission.
The operation rule of the
proportioning feeder is as per the following: at the charging begin arrange
close to 30 kg of material are filled the mill, after which charging is
performed by break even with 15 kg parcels at 10 to 15 operation minutes
interim.